The 7 year project is expected to reduce CO2 emissions by approximately 25,000 tonnes.
DP World, Emirates NBD and 40 companies discuss volunteering programmes.
The hydroponic farming hub is expected to launch on the last quarter of 2018.
The station is equipped with the Vapor Recovery Systems to prevent and control emissions.
The system will result in AED 10 million in savings as well as 882 tons of carbon dioxide emissions.
The pre-summer awareness campaign highlights preparations to reduce energy consumption in summer